Reference projects

This overview of our latest projects gives you an impression of our scope of performance.

Overview of reference projects

 

WP Gerichtstetten
WP Haßmoor
WP Lahn
WP Flechum

34 x E141 EP4 NH 159m

Consultation of the owner and accompanying concrete tower repair works

 

WP Thepharak/T1 (TH)
WP Krissana/NKS (TH)
WP K.R. One/T4 (TH)

each 30 x GE 3.0-137 NH 156,5m

Quality control and Quality assurance throughout the construction phase of pit, foundation, concrete tower and crane pad

WEC Huraymila (KSA)
WEC Turaif (KSA)

1 x GE 2.85-120 NH 120m each

Quality controls and site management throughout the construction phase of pit, foundation, e-house, crane pad and roads

WF Bardowick (GER)

Construction management and acceptance of earth engineering, foundation construction and concrete tower construction (one of 100 GE hybrid tower projects since 2013)

WEC ADWEN 8 MW Prototype (GER)

1 x AD8-180

Quality controls and site management throughout the construction phase of pit, foundation, crane pad and roads

WF Noor-Oost-Polder (NL)

26 x Enercon E-126

Non-destructive localization of rebar

Wind Farm Koenigshovener Hoehe (GER)

21 x SENVION 3.4M-114 NH 143m

Construction management and acceptance of earth engineering, foundation construction and concrete tower construction (one of 68 Senvion projects since 2010)


Seegronan Wind Farm (IRE)

6 x Enercon E-82 NH 139m

On-site inspection of foundation construction


Krnovo Wind Farm (MNE)

26 x GE 2.85 – 103 NH 85

Construction site assistance, concrete and grouting work

Wind Farm Schenkenberg (GER)

GE 2.75-120 NH 139m

Space Frame Tower Quality control throughout the construction phase and acceptance of foundations prototype foundation


Lousa Wind Farm (PT)

14 x GE 2.5xl

Foundation assessments

Wind Farm Worms (GER)

2 x GE 1.5sl NH 85m

Assessment and movement measurements concrete base foundations


Akhfennir Wind Farm (MAR)

56 x GE 1.89 NH 85m

Construction site assistance Anchor cage construction

Wind Farm Hilgermissen (GER)

1 x Vestas V90 NH 100m

Movement measuring to verify successful restoration


BigaRes Wind Farm (TUR)

19 x GE 3.2-102

Construction site assistance for anchor cage construction and grouting work

Melo Wind Farm (URY)

13 x Nordex N100

Construction site assistance for quality management and concrete restoration


OWP Borkum Weg II (GER)

40 x Areva/Adwen 5M

Quality interface management